Badowita-Ratmalana Location 2
Location
Badowita-Ratmalana Location 2
This is the second strainer implemented in partnership with Fabric & Apparel Accessory Manufacturers Association (FAAMA). This strainer installed. It also helped in intercepting mixed waste floating towards the Nedimala Canal which connects to the Bolgoda lake. In 2024, a total of 81,385 kg of mixed waste was diverted from going to ocean just by this strainer. By the end of 2024, 81,385 kg of mixed waste was collected by this strainer.
Badowita-Ratmalana Location 2