Muhandiram Jetty
Location
Muhandiram Jetty
In partnership with Filotex Lanka Pvt Ltd, we installed an ocean strainer at a location that connects to the Negombo Lagoon. It is expected to intercept the floating debris entering the lagoon with the installation of these Ocean Strainers and the results are promising with the amount of waste that is being collected during the period. By the end of 2024, 996 kg of mixed waste was collected by this strainer.
Muhandiram Jetty